Which Unplanned Shutdowns Cost the Most? Ranking Trips by Cost

Rank unplanned shutdowns and compressor trips by what they cost, not how often they happen: deferred production, call-outs and gas flared during upsets.

· Arolytics
SCADAOperations

Short answer

Rank unplanned shutdowns by cost per year, not by count: for each recurring pattern, multiply how often it happens by what one event costs in deferred production, call-outs, repairs and gas flared or vented during the upset. Ranked by count, by hours down and by cost, the same list can come out in three different orders, and cost is the one a budget can act on.

Key takeaways

  • The cost of unplanned downtime is counted per recurring pattern: how often it happens times what one event costs.
  • Cost per event usually has four parts: deferred production, the call-out and repair, gas flared or vented during the upset, and any penalty or carbon cost that applies.
  • Hours down run from the trip to the return to the pre-trip rate, not to the restart: the ramp-back is part of the event.
  • Deferred production is not always lost production. Some comes back after the restart, so value it at your own netback and state what you assumed.
  • A shutdown that sets off trips elsewhere should carry their cost too, or the ranking undervalues it.

Why rank by pattern, not by event?

Unplanned shutdowns repeat: the same unit trips on the same limit, the same battery shuts in on the same level. One fix stops the whole pattern, so the pattern is the unit of decision; a list of single trips mostly measures how noisy a unit is.

Group trips by shared mechanism (the same unit, the same tags moving in the same order) before costing anything: see why a compressor keeps tripping.

What goes into the cost of one unplanned shutdown?

The cost of one unplanned shutdown is what it defers, what it takes to restart and what it releases. Supervisory control and data acquisition (SCADA) data gives the volumes and hours; your records give the prices.

Cost componentWhat it isWhere the number comes from
Deferred productionRate before the trip × hours until back at that rate × your netbackSCADA flow before and after; your netback
Call-out and labourTravel, overtime, a mechanic if neededYour cost per call-out; drive time to site
Repair and restartParts, rentals, failed restart attemptsWork orders
Flaring or venting during the upsetGas flared upstream while the unit is down; gas vented in a blowdownFlare and vent flows in SCADA, or an estimated volume; product value plus any carbon cost
Penalties and riskDelivery shortfalls, flaring limits, spill riskContracts, site rules, your risk matrix

Count hours down from the trip until the unit is back at its pre-trip rate: a restart at 06:00 that reaches full rate at 09:00 is three more hours of deferral.

Is deferred production lost production?

Not always. Deferred production is the volume not produced while a unit or well is down. Some of it comes back: wells shut in during an outage can produce above their earlier rate for a while after the restart (flush production), and line pack can absorb part of a gap. Some doesn’t: gas flared while a station was down is gone, and a system already at capacity can’t catch up.

Value deferral at your own netback and say what you assumed: all-lost overstates the cost, all-recovered understates it.

How much does the ranking method change the answer?

Illustrative, invented example: four recurring patterns on one gathering system over one year. Gas is valued at an assumed $70 per thousand cubic metres (e³m³), about $2 per thousand cubic feet (MCF); call-outs at an assumed $850, or $1,500 when two operators go; no carbon cost is included.

PatternEvents a yearHours down a yearCost per eventCost per year
Battery 6: wells shut in on high separator level4628$210$10k
Station 2, Unit K-3: trips on high scrubber level, cold mornings2270$3,460$76k
Station 4, Unit K-1: trips on low lube-oil pressure950$6,860$62k
Station 2: every unit trips on a utility power dip436 (whole station)$21,190$85k

How the figures are built, all invented:

  • Battery 6: 120 e³m³ a day, down 0.6 hours each time, restarted remotely with no call-out.
  • K-3: 280 e³m³ a day, down 3.2 hours each time, plus a call-out.
  • K-1: 300 e³m³ a day, down 5.5 hours each time, plus a call-out and $1,200 for a mechanic.
  • Power dips: the whole station’s 750 e³m³ a day, down 9 hours each time, plus a two-operator call-out. Of the 281 e³m³ not compressed each time, about 30 e³m³ is flared upstream before wells are shut in: 120 e³m³ (about 4,200 MCF) a year for the emissions record too.

Ranked by count, Battery 6 comes first. Ranked by hours down, K-3 does. Ranked by cost, the four power dips do, with the fewest events on the list.

Cascades change the ranking too. In this illustration, 8 of K-3’s other trips came within 15 minutes of a Battery 6 shut-in, on low suction pressure. Charged to Battery 6 at 2 hours down and a call-out each, they add about $20k, which takes Battery 6’s pattern from about $10k to about $30k a year.

What happens after the ranking?

Set each pattern’s cost against its fix’s cost and decide: fix now, keep watching, or accept it as normal operation. In the illustration, an invented $6,500 heat-tracing repair against $76k a year for K-3 is an easy call. An invented $25,000 for backup power on the unit control panels, against $85k a year of power-dip trips, is a budget conversation. Battery 6 stays on watch, now costed with the trips it sets off downstream.

Then measure the same pattern before and after the fix, under comparable conditions: for K-3, next winter against this one.

What this doesn’t cover

  • Finding what’s behind a trip pattern: why a compressor keeps tripping.
  • Throughput lost without a shutdown: where lost throughput hides.
  • Ranking emission events by volume and carbon cost: how to prioritize methane events.
  • Production accounting and royalty treatment of deferred volumes, which follow your own rules and jurisdiction.

How Arolytics approaches this

AroIQ finds the trips and shutdowns in the SCADA data you already collect, counts the throughput each one deferred and groups them into patterns with ranked likely causes. You set the levers (your own cost per event type, per hour down or per tonne, or count-based KPIs), Triage ranks every pattern across every site by cost with a status of act now, watch or normal operation, and the Investment Plan sets what each fix costs against what it returns. Start with a trial on 12 to 24 months of your own history.

Frequently asked questions

What does unplanned downtime cost in oil and gas?

It depends too much on rate, product price and call-out cost for one typical figure to help. Cost your own: rate × hours down × netback, plus call-out, repair and any gas flared or vented, with the method shown. Be wary of a cost per hour quoted without its method.

Should planned shutdowns be in the ranking?

Track them, but rank them separately: planned maintenance has a known reason and a scheduled cost, and mixing it in buries the fixable patterns. A planned shutdown that overruns is worth its own look.

How do you rank downtime without a gas price?

Use hours down or deferred volume, or a count-based KPI such as trips per month on a pattern. Each beats raw event count, because it weighs a nine-hour outage above a half-hour shut-in.

Should flaring during an upset count against operations or emissions?

Both. Flared gas is lost product for operations and a release, possibly with a carbon cost, for emissions. Count it once, in the pattern that caused it: see methane reductions through operational efficiency.


Arolytics is a Calgary company that makes SCADA-based emissions and operational intelligence software for oil & gas. Its software, AroIQ, turns the SCADA data operators already collect into operational and methane emission events, each with a measured impact and likely causes, ranked by what they cost: methane reductions through operational efficiency. AroIQ needs no new field hardware.